When a connection is required
A connection is required for every new building not yet on the network. It is also required when a change of use increases a building's drainage, for example when a home becomes a restaurant.
Connecting a building to the network without a permit is an offence. Unpermitted connections cause sewage to overflow into the street.
What you need
- Building permitOr proof that the building is permitted. About building permits
- A recent property statementGet a property statement
- Unified national ID cardThe owner's.
- Internal drainage planShows where the pipes leave the building.
Steps
- Apply Ur portalChoose "Sewer pipe connection" and upload your documents. You get an application number.
- Visit your district office District officeBring the original documents and your application number so they can be checked.
- Site inspectionThe sewer team decides where to connect and how long the pipe will be.
- Pay the fees Ur portalBased on the length of the connection and the pipe size.
- ConnectionDone by the Sewerage Department, or by a licensed contractor it supervises.